PHOTO GALLERY Garden Rooms 1. Getting started - Aug 2020 2. Equipment has moved in - November 2020 3. Walls being poured - Feb 2021 4. Regrading trenching for utilities - Feb 2021 5. Welding steel decking into place on plaza - Feb 2021 6. Progress and equipment - February 2021 7. Roof deck poured - March 2021 8. Construction of north planter on top of roof deck - March 2021 9. Progress on plaza - March 2021 10. Working on interior of garden room - March 2021 11. Fireproofing for garden rooms - March 2021 12. Finishing the slab on the plaza - March 2021 13. Completed the topping for the slab for the plaza - March 2021 14. Exterior of garden rooms progress - March 2021 15. New exterior stairs by garden rooms - March 2021 16. Interior walls of garden rooms getting started - March 2021 17. Progress on interior walls - April 2021 18. Interior of garden rooms looking out to the garden - April 2021 19. Exterior of garden rooms - April 2021 20. Plaza surface complete - April 2021 21. Reinstalling limestone on plaza - April 2021 22. Exterior progress of garden rooms - April 2021 23. Re-grading garden area - April 2021 24. Continuing limestone re-installation on plaza - April 2021 25. Beginning limestone re-installation on garden rooms May 2021 26. Limestone re-installed on front of garden rooms April 2021 27. Precast concrete coping installation May 2021 28. Garden rooms interior progress - ceiling and soffits framed May 2021 28. Spacious new plaza May 2021 28. Storefront frames installation May 2021 29. Trenches being dug and footings being poured for retaining walls for ramps May 2021 30. Progress on interior 5.25.21 31. Garden area ramps 5.26.21 32. View out of new door from Narthex to Plaza 5.27.21 33. Pouring concrete for ramp outside garden rooms 5.28.21 34. New doors from Narthex to Plaza 6.2.21 35. New porch off garden rooms 6.3.21 36. Garden rooms video wall 6.3.21 37. Interior progress 6.10.21 38. Exterior hallways 6.10.21 39. Getting the floor ready to install the carpet 6.15.21 40. Carpet installed! 6.15.21 41. Plaza insulation installation 6.15.21 42. Installation of pavers on plaza 6.22.21 43. Garden rooms interior progress 6.24.21 44. Garden ramps and stairs progress 6.25.21 45. New partition walls 7.7.21 46. Plaza paving has been completed 7.7.21 47. Exterior and garden area - sidewalks, ramps and stairs 7.7.21 48. Garden area around the fountain has been leveled 7.9.21 49. Glass railing being installed at upper plaza 7.9.21 50. Our garden rooms have reached the punch list stage! 7.14.21 51. We have a beautiful glass railing on the upper plaza 7.14.21 52. The area around the fountain has been leveled 7.14.21 53. We have a new sidewalk to the fountain 7.14.21 54. A great view of our new spaces - the upper plaza and garden terrace 7.22.21 55. The view from our upper plaza 7.22.21 56. A view of the garden area from the garden terrace 7.26.21 57. The garden area is almost ready for landscaping! 7.27.21 58. Diane demonstrates our new movable walls 8.9.21 59. Railings have been installed on the garden stairs 8.12.21 60. Upper plaza & garden terrace at night 9.23.21 61. Green! Grass has been installed around the fountain 9.23.21 New Main Entrance 1. Future new entrance -getting started in August, 2020 2. The big dig 3. Starting to add the wall for the elevator shaft 4. Going up! 5. Elevators installed and outer panels being put into place 6. Interior elevator progress March 2021 7. Interior elevator progress March 2021 8. New elevator lobby March 2021 9. New elevator lobby March 2021 10. Beginning exterior panel installation - late March, early April, 2021 11. Elevator lobby flooring installation April 2021 12. New entrance panel installation April 2021 13. Elevator lobby April 2021 14. New entrance April 2021 15. New entrance panel installation complete April 2021 16. Elevator lobby and halls April 2021 17. Elevator lobby and halls April 2021 18. New elevators from sanctuary level April 2021 19. View of new entrance from upstairs and exterior April 2021 20. David in front of new elevators on sanctuary level April 2021 21. 2nd floor elevator lobby and kitchenette 22. New entrance walkways being built 23. Preparing to install doors 5.25.21 24. Pathway to new entrance starting to take shape 6.2.21 25. New doors installed 6.10.21 26. Good-bye old elevator! 27. Sidewalk has been poured 7.7.21 28. Interior walls of entrance have been sheet rocked 7.7.21 29. Welcome! Our new main entrance is getting close to completion! 7.14.21 30. An open view of the central stairs from the new entrance lobby! 7.27.21 31. Vestibule doors installed at main entrance lobby 8.18.21 32. Both vestibule doors installed and grass is growing outside! 8.25.21 33. Grass has been installed! 9.9.21 34. And plants in the garden 9.9.21 35. Main entrance lobby 9.23.21 36. Main entrance at night 9.23.21 Central Stairs 1. Structural framing between north & south areas on 2nd level Feb 2021 2. Bridge deck steel welding prior to concrete pour March 2021 3. Bridge between two sides on 2nd level March 2021 4. Bridge between two sides on 2nd level April 2021 5. Court of Flags floor removal - future site of central stairs March 2021 6. Court of Flags floor removal - future site of central stairs March 2021 7. Court of Flags floor removal - future site of central stairs March 2021 8. Court of Flags floor removal - future site of central stairs March 2021 9. Future site of central stairs 10. Future site of central stairs 11. Future site of central stairs 12. Future site of central stairs April 2021 13. New stairs have arrived April 2021 14. View from first level April 2021 15. Stairs being installed April 2021 16. Future site of central stairs April 2021 17. Steel frame of new landing for central stairs April 2021 18. New permanent wall in Stone Hall April 2021 19. Lower level stairs going up April 2021 20. Lower level stairs going up April 2021 21. Central stairs progress from above April 2021 22. Central stairs looking more central! May 2021 23. Central stairs from 1st floor May 2021 24. Central stairs up to Sanctuary level May 2021 25. 5.26.21 26. 1st floor central stairs lobby 6.10.21 27. 2nd floor central stairs lobby 6.10.21 28. New automatic fire doors between elevator entrance and central stairs 8.2.21 29. Starting to install some drywall in the central stairs 8.2.21 30. Drywall progress 8.3.21 31. Drywall progress 8.3.21 32. Railings installed 8.18.21 33. Down-lights in columns 8.18.21 34. Flooring installation on stairs 8.18.21 35. New 2nd floor central stairs lobby 8.25.21 36. Prep for installation of terrazzo flooring on central stairs landing 8.25.21 37. Terrazzo flooring installed on landings of central stairs 8.25.21 38. Glass railings and finished terrazzo flooring 9.9.21 39. View from top landing down to Garden Rooms entrance 9.17.21 40. 9.23.21 41. From below 9.23.21 Railings installed 10.1.21